Mongolia

Description

Overview
Sector Transport
Focus area Public transport, Passenger vehicles
Type of action Strategy/Policy
Scope Not known
Stage Under development
Submitted to UNFCCC registry Yes
Start of initiative 2015
Financing and support details
Financing status Seeking financing
Total cost US$ 1848 mln
Financing requested US$ 582 mln
Financing received to-date
(no data)
Principal source of financing Multilateral
Principal type of financing Grant
Capacity building required Yes
Technology transfer required Yes
Additional information
Proponent(s) Ulaanbaatar Transportation Department (UTD)
International funder(s)
(no data)
Organization providing technical support
(no data)
Contact
(no data)
Objective:

The overall objective of the NAMA is to establish a sustainable urban passenger transport system in Ulaanbaatar

Activities: (2017 - 2030)
The NAMA aims to achieve this by inducing a transformational change in the city towards low-carbon sustainable passenger transport by doubling the mode share of public transport compared to BAU, by reducing congestion and time lost in traffic and by increasing the city attractiveness.

The NAMA contributes by around 20% towards achieving the mitigation target of 14% lower GHG emissions compared to BAU as set out in the INDC of Mongolia. The four Mitigation Actions included under this NAMA are the following:

MA1: BRT system with 65km of bus-only lanes

MA2: Establishment of a metro of 18km

MA3: Retrofit of taxis to LPG

MA4: Low-carbon buses including hybrids and electric trolleybuses

Impact and MRV

No Data Available.png
Cumulative GHG reductions: 19.4 MtCO2e
Mitigative capacity:

No information has been provided on mitigative capacity

Co-benefits:

Social: * time savings
  • reduced accidents
  • improved air quality
  • reduced health problems
Economic: * job creation
Environmental: * 60 tons PM2.5 and 4,300 tons NOx avoided

MRV Framework:
No MRV plan has been defined


Funding is expected to be covered by:
  • Equity: 176 MUSD / 136 MUSD
  • Commercial credit: 978 MUSD / 318 MUSD
  • ODA/IFI loans: 300 MUSD / 0 MUSD
  • Climate finance: 575 MUSD / 75 MUSD
  • Total finance: 2,029 MUSD / 529 MUSD
It is estimated that MA1 is worth 55MUSD, MA2 500MUSD, MA3 1MUSD and MA4 19MUSD